Citation
Basu, Kartik Prasad and Sayed Abdullah, Syed Ahmad Hafidz and Mohamad Nor, Normiza and George, Moleykutty (2013) Rebuilding of three-phase load voltage during single-phase auto reclosing in medium voltage distribution lines. International Journal of Electrical Power & Energy Systems, 53. pp. 478-481. ISSN 0142-0615
Text
Rebuilding of three-phase load voltage during single-phase auto reclosing in medium voltage distribution lines.pdf Restricted to Repository staff only Download (368kB) |
Official URL: http://www.sciencedirect.com/science/article/pii/S...
Abstract
Most faults in medium voltage (MV) distribution lines are temporary single line to ground (LG) faults. Single-phase auto reclosing (SPAR) may be used to remove the LG fault producing highly unbalanced and low voltage across the load during the reclosure dead time. The negative sequence voltage produced may cause severe over heating in three-phase induction motors. It is proposed to connect a zigzag winding grounding transformer at the remotest load bus to rebuild the three-phase voltage during the SPAR dead time. The zigzag transformer neutral should remain disconnected from the ground during normal operation.
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering (FOE) |
Depositing User: | Ms Nurul Iqtiani Ahmad |
Date Deposited: | 18 Feb 2014 00:49 |
Last Modified: | 18 Feb 2014 00:49 |
URII: | http://shdl.mmu.edu.my/id/eprint/5257 |
Downloads
Downloads per month over past year
Edit (login required) |