Items where Subject is "TH5011-5701 Construction by phase of the work (Building trades)"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: E
Number of items at this level: 1.

E

Eirgash, Mohammad Azim and Tiang, Jun Jiat and Ateş, Bayram and Sharma, Abhishek and Lim, Wei Hong (2025) A Reinforcement Learning Guided Oppositional Mountain Gazelle Optimizer for Time–Cost–Risk Trade-Off Optimization Problems. Buildings, 16 (1). p. 144. ISSN 2075-5309

This list was generated on Wed Jul 1 15:29:31 2026 +08.